All Case Studies

Manufacturing

Plant-wide SOP Library for a Process Manufacturer

62%Faster shift handover
Plant-wide SOP Library for a Process Manufacturer

A 1,200-strong manufacturer was bleeding hours at every shift change. Contera authored 340 SOPs across 11 functions with embedded control checkpoints.

Average shift handover dropped from 47 to 18 minutes and first-time-right on changeovers improved by 23 points within four months.

Made with Emergent